Documents
Information hub
Landowner documents
-
Green GEN Towy Teifi - Environmental and Engineering Surveys leaflet - Phase one consultation 2024 - Green GEN Cymru Environmental and Engineering Surveys leafletDownload
-
Green GEN Towy Teifi - Landowner Payments for New Electricity Infrastructure leaflet - Phase one consultation 2024 - Green GEN Cymru Landowner Payments for New Electricity Infrastructure leafletDownload
Non-statutory consultation materials
On this page you can view and download a section of materials that provide more information about our proposals for the Towy Teifi connection.
-
Green GEN Towy Teifi - Feedback Summary Report - Green GEN Cymru Publication of our phase one consultation Feedback Summary Report for the Towy Teifi projectDownload
-
Green GEN Towy Teifi - Consultation brochure (Single pages) - Phase one consultation 2024 - Green GEN Cymru An overview of our proposals for Towy Teifi and how to take part in the consultationDownload
-
Green GEN Towy Teifi - Consultation postcard - Phase one consultation 2024 - Green GEN Cymru Postcard sent to all residential and business addresses in the consultation zoneDownload
-
Green GEN Towy Teifi - Consultation feedback form - Phase one consultation 2024 - Green GEN Cymru A copy of the feedback form that you can fill in to provide feedback on our proposals for the Towy Teifi connectionDownload
-
Green GEN Towy Teifi - Consultation event panels - Phase one consultation 2024 - Green GEN Cymru Event panels shared at the consultation eventDownload
-
Green GEN Towy Teifi - Project FAQ - Phase one consultation 2024 - Green GEN Cymru A summary of some of the key questions and answers for the Towy Teifi connectionDownload
-
Green GEN Towy Teifi - Project Poster - Phase one consultation 2024 - Green GEN Cymru Poject PosterDownload
-
Green GEN Towy Teifi - Routeing and Consultation Document - Phase one consultation 2024 - Green GEN Cymru A report outlining the identification of route options and our approach to consultationDownload
-
Green GEN Towy Teifi - Routeing and Consultation Document Appendices - Phase one consultation 2024 - Green GEN Cymru A report outlining the identification of route options and our approach to consultationDownload
-
Green GEN Towy Teifi - Routeing and Consultation Document Figures 1 - Phase one consultation 2024 - Green GEN Cymru A report outlining the identification of route options and our approach to consultationDownload
-
Green GEN Towy Teifi - Routeing and Consultation Document Figures 2 - Phase one consultation 2024 - Green GEN Cymru A report outlining the identification of route options and our approach to consultationDownload
-
Green GEN Towy Teifi - Routeing and Consultation Document Figures 3 - Phase one consultation 2024 - Green GEN Cymru Key information on EMF's and their relation to the projectDownload
-
Green GEN Towy Teifi - Updated Phase One Grid Connection Strategy - Phase one consultation 2024 - Green GEN Cymru A report presenting the process for the identification and appraisal of route optionsDownload
-
Green GEN Towy Teifi - Approach to routeing Grid infrastructure in Wales - Phase one consultation 2024 - Green GEN Cymru A report presenting the Approach to routeing Grid infrastructure in WalesDownload
-
Green GEN Towy Teifi - Electric and Magnetic Fields (EMFs) information sheet - Phase one consultation 2024 - Green GEN Cymru Information on the Electric and Magnetic Fields (EMFs)Download
Project maps
Your smarter, renewable future starts today.
Want to keep up to date?
Please register your contact details with us if you would like to be kept informed about our project.
Register here